Home | Book Store | Toolstore | Consulting Room | Contact | FAQs & Search | About


 
Drop Down Menu

Tool Store Risk assessment tool
QM Principles Fishbone
Process/Clause Alignment
MSD Work Packages
ISO 9001 Validation Tool
ISO 9001 Auditing Tool
TS 16949 Compliance Table
TS 16949 Auditing Tool
AS9100B Auditing Tool

Management Systems Development
Work Package Descriptions

EB025 Price £50.00 MS Word format
A set of 10 modifiable Work Package Descriptions in a Zip File addressing all the work needed to develop a process based management system

Buy now

These Work Package Descriptions (WP) divide the work required to develop a process based management system into 10 discrete stages with each addressing:

  • The stage Objectives

  • The Inputs required

  • The Training required

  • The Tasks to be carried out

  • The Outputs from carrying out the tasks

  • The tangible Deliverables that are used as inputs to other stages


Uses

  • Managing Projects

  • Estimating work required

  • Preparing work schedules

  • Preparing Bar Charts

  • Assigning tasks

Sample Work Package  EB025-sample.pdf

 

Active scripting needs to be enabled in IE to use the pull down menus
Last amended 24/11/2011
Home | Book store | Tool Store | Consulting Room | FAQs and Search | Contact

© Transition Support 2011