|
These Work Package Descriptions
(WP) divide the work required to develop a process based management
system into 10 discrete stages with each addressing:
-
The stage Objectives
-
The Inputs required
-
The Training required
-
The Tasks to be carried out
-
The Outputs from carrying out
the tasks
-
The tangible Deliverables that
are used as inputs to other stages
Uses
-
Managing Projects
-
Estimating work required
-
Preparing work schedules
-
Preparing Bar Charts
-
Assigning tasks
Sample Work Package
EB025-sample.pdf |